Proposed Projects
Project Description
The applicant, CSP Evanston Land LLC, is proposing a Planned Development to allow a 27-story mixed-use development including 358 residential dwelling units (including over 10% Inclusionary Housing units) and approximately 3,000 square feet of ground-floor commercial space. A minimum of 79 parking stalls will be leased from the City within the Maple Avenue garage to accommodate parking demand from the proposed building.
It should be noted that the specific development attributes may change and evolve as this project continues through the zoning entitlement process.
Current Status: The application is currently under review by the City. The next step in the zoning entitlement process will be a public hearing with the Land Use Commission at a date not yet determined. The City Council is the final decision maker on the application.
Project Materials:
Current Development Plans (subject to change as the project advances)

The applicant, Charles Marlas of the Kensington School, has requested approval to demolish the existing building on the property and construct a new 2-story and 19,952 square foot building for a Kensington School daycare. The site would include a 38-space parking lot with left-in/right-out access along Central Street and right-in/right-out access along Gross Point Road. On the western side of the site, a separate access point would be added to provide a driveway to the First Williamsburg Co-op development. The property would also include playground areas to the south and west of the proposed building and the daycare is being built to accommodate up to 166 children. Hours of operation would be between 6:30am-6:30pm, Monday-Friday. The proposal requires Planned Development approval, which must be reviewed by the Land Use Committee and requires final approval from the City Council.
The specific development attributes may change and evolve as this project continues through the Planned Development approval process.
Land Use Commission: The project appeared before the Land Use Commission on January 14, 2026, and received a recommendation of approval. Links to the application materials and meeting minutes from the meeting can be found on the Land Use Commission webpage.
Current Status: The application is tentatively scheduled to appear before the Planning and Development Committee and City Council on March 9, 2026. Once confirmed, the meeting agendas and project materials will be available on their respective webpages: Planning & Development webpage and the City Council webpage.
Project Materials:
Current Development Plans (subject to change as the project advances)
The applicant, Chicago Stars FC, is proposing a unique use for the Chicago Stars FC to play at Ryan Field (1501 Central Street) for 5 years upon its completion, beginning in Fall 2026. The seasons will run March-November with an anticipated 15-17 matches per season.
Current Status: The application materials are currently under review by the City. The next step in the zoning entitlement process will be a public hearing with the Land Use Commission at a date not yet determined. City Council is the final determining body for the project.
Project Materials: Current Project Plans (subject to change as the project advances)
.jpg?t=202602131103360)
The applicant, Anthony Kaplunov of Krosha Properties LLC, is proposing a 3-story townhome development with 11 four-bedroom units (including 1 Inclusionary Housing unit). The development would be structured as a condominium with all units being marketed for-sale. Each unit would include two garage parking spaces at the rear with access from the alley. The 3rd floor of each residence would include a rooftop terrace facing Central Street, and all units would have a basement. The proposal requires a height variation, building lot coverage variation, and a rear yard coverage variation, all of which requires review and approval by the Land Use Commission.
It should be noted that the specific development attributes may change and evolve as this project continues through the zoning entitlement process.
Current Status: The application is currently under review by the City. The next step in the zoning entitlement process will be a public hearing with the Land Use Commission at a date not yet determined. The Land Use Commission is the decision making body for this project.
Project Materials: Development Plans

The applicant, PM Properties LLC, is proposing a 5-story multi-family residential rental development with 30 units (including 3 Inclusionary Housing units). The site would include 4 parking spaces at the rear of the building with access from the alley, and the developer would lease an additional 5 parking spaces from a nearby parking garage for additional tenant parking. The building would feature a rooftop deck and would also include solar panels over a portion of the roof. The proposal requires a density variation, parking variation, and a rear yard coverage variation (for the parking spaces), all of which requires review by the Land Use Commission and approval by the City Council.
It should be noted that the specific development attributes may change and evolve as this project continues through the zoning entitlement process.
Current Status: This project is scheduled for a public hearing with the Land Use Commission on February 25th, 2026. The plans and application materials will be available for viewing on the Land Use Commission webpage on February 20, 2026, along with details on how the public can participate in the hearing.
Project Materials: Development Plans

September 2024 - Request for Proposals (RFP)
The City has released the most recent Request for Proposals (RFPs) for the rehabilitation and adaptive use of Harley Clarke and its grounds.
Spring 2024 - Request for Proposals (RFP)
The City has released a Request for Proposals for the rehabilitation and adaptive use of Harley Clarke and its grounds. This follows an earlier Request for Expression of Interest (REI). The responses to the REI affirmed that the property remains highly valuable and represents a significant opportunity for renewed life and vibrancy.
The City believes this new opportunity will produce a vibrant, financially sound, and financially sustainable vision for the property that spurs cultural benefit and place-based economic development potential for all of Evanston.
Additional RFP Information
Links to additional information including maps, floor plans, photos, historical documentation, conditions assessments and cost estimates, and additional pertinent reports and studies are available on the projects website. Please contact Cade W. Sterling, Preservation Planner at 847-448-8231 or csterling@cityofevanston.org with any questions.
Timeline of City Ownership and Initiatives
| Year | Description |
|---|---|
| 1965 | City of Evanston purchases property from Sigma Chi Fraternity |
| 1965-2015 | City leases property to Evanston Arts Center |
| July 2011 | City Council directed City Staff to identify other possible uses |
| May 2012 | Staff distributed a Request for Interest |
| July 2013 | Council rejects the one RFP received to turn property into hotel |
| End of 2013 through 2015 | Illinois Department of Natural Resources tried to negotiate about purchase of property |
| January 2015 | Citizens Committee was formed to study uses for the mansion |
| June 2015 | Committee presented report to City Council |
| October 2015 | City Council requested to discontinue proposal discussions |
| September 2016 | City Council approves proposal for City to keep property and allocate $250,000 for improvements |
| November 2016 | Harley Clarke Planning Committee was formed to discuss next steps |
| June 2017 | Request from committee to lease to Evanston Lakehouse and Gardens (denied); request was amended to send out a Request for Proposal for other not-for-profit organizations that may be interested in leasing |
| August 2017 | RFPs Issued Seeking Qualified Non-Profit Entity to Lease the Harley Clarke Mansion |
| November 2017 | Evanston Lakehouse & Gardens response to the RFP was approved by Council |
| March 2018 | Ordinance 42-O-18 authorizing Evanston Lakehouse & Gardens lease was approved for Introduction by Council |
| April 2018 | Ordinance 42-O-18 failed 7-2 for Action |
| June 2018 | Resolution 43-R-18 approved 6-3 for Action |
| July 2018 | Resolution 51-R-18 approved 5-3 for Action |
| August 2018 | Memorandum of Understanding with Evanston Lighthouse Dunes |
| October 2018 | Preservation Commission votes 9-0 to deny Certificate of Appropriateness |
| November 2018 | Evanston voters support advisory referendum to protect from demolition and preserve the Harley Clarke buildings and gardens. |
| November 2018 | Preservation Commission Findings. Attachments can be found in the October 23 Preservation Commission meeting agenda. |
| November 2018 | Notice of Appeal from Evanston Preservation Commission's Decision |
| December 2018 | Request to hear the appeal was denied 9-0 |
| March 2019 | Discussion on next steps for the Mansion. Request was made to return April 15, 2019 with a new RFP. |
| April 2019 | Harley Clarke Mansion RFP. Motion was made to remove the option to sell, add additional dates as needed for tours, and expand on community component. Passed 5-3. |
| December 2019 | Long-Term Lease Agreement with the Artist Book House |
| January 2023 | Artist Book House withdraws from lease agreement |
| September 2023 | Updated Request for Expressions of Interest Issued. The City received ten responses, affirming the property remains highly valuable and represents a significant opportunity for renewed life and vibrancy. |
History of the Harley Clarke Mansion
Located adjacent to the Grosse Pointe Lighthouse and Lighthouse Beach in the northeast corner of Evanston, the Harley Clarke Mansion is a historic English Tudor mansion. The City of Evanston purchased the property from the Sigma Chi National Fraternity in 1965 as part of the development of the Lighthouse Landing Park. The mansion was originally a private residence, but had served as the fraternity’s national headquarters from 1951-1965. The City of Evanston leased the building to the Evanston Arts Center from the late 1960s until 2015, when the property began to require more maintenance than either the City or the Art Center was able to fund. The Evanston Arts Center moved to a new location on Central Street and the property was closed. In 2013, the City rejected one Request for Proposal to turn the property into a hotel. The City then reviewed responses to a Request for Proposal to lease the property to a not-for-profit organization. After the proposal from Evanston Lakehouse & Gardens was denied by City Council in 2017, the Evanston Lighthouse Dunes group submitted a request to donate funds to demolish the Harley Clarke Mansion and Coach House and restore the dunes. The Preservation Commission denied this proposal.
Request for Proposal with Evanston Lakehouse & Gardens
The City of Evanston requested proposals to enter into a long-term lease with a non-profit organization that will invest in and renovate the Harley Clarke Mansion to create a high quality public use for the space consistent with the 2008 Lakefront Master Plan. The City received one response from Evanston Lakehouse & Gardens. City Council approved the response on November 13, 2017. City Council directed City Staff to move forward with lease negotiations. The proposed lease (Ordinance 42-O-18) was approved for Introduction at the March 12, 2018 City Council, but failed 7-2 for Action on April 9, 2018.
- Request for Proposal - RFP, Addendum 1, Addendum 2
- Evanston Lakehouse & Gardens Response - ELHG Response
- Ordinance 42-O-18, Lease of City-Owned property located at 2603 Sheridan Road to ELHG
Past Responses to Request for Proposals
Artistic Book House Proposal
Evanston Community Lakehouse & Gardens Proposal
Evanston Conservancy Proposal
ONECommunity Museum Website

Vermilion Development submitted a zoning application for a Planned Development to allow a 31-story mixed-use development at 605 Davis Street in Downtown Evanston. The original application included 3,200 square feet of ground floor commercial space, 80 parking spaces on floors 2-3, and a total of 430 multi-family residential rental units above. The project also featured 86 Inclusionary Housing units to be dispersed through-out the building. The developer proposed to lease an additional 114 parking spaces from the City in nearby City-owned garage facilities.
Community Meeting: The developer held an initial community meeting to introduce the project to nearby residents, businesses, and property owners. This meeting occurred on Thursday, April 3rd, 2025. A second community meeting was held on Tuesday, April 29th at the Evanston Public Library Main Branch.
Land Use Commission: The project appeared before the Land Use Commission on July 23, 2025, August 13, 2025, and finally on August 27, 2025, where the Land Use Commission ultimately voted 3-4 on a motion to recommend approval of the application. Since a majority of commissioners voted against the motion, the motion for approval failed and the project traveled to the Planning & Development Committee and City Council without a positive recommendation from the Land Use Commission. Links to the application materials and meeting minutes from each meeting can be found on the Land Use Commission webpage.
Planning and Development Committee & City Council: The Planning & Development Committee and City Council each met on September 29th, 2025, to discuss the application. The meeting agendas and project materials reviewed by both public bodies are contained on their webpages: Planning & Development webpage and the City Council webpage. The Planning & Development Committee moved the project on to the City Council and the City Council voted to table introduction of the project until their meeting on October 27, 2025, to allow the developer to address concerns raised by certain councilmembers.
2nd City Council Meeting: The developer submitted revised plans for consideration by the City Council, which showed a 29-story mixed-use development with 2,920 square feet of ground floor commercial space, 40 parking spaces on the second floor, and a total of 419 multi-family residential rental units above. The project also featured 84 Inclusionary Housing units to be dispersed through-out the building. The developer proposed to lease an additional 153 parking spaces from the City in nearby City-owned garage facilities. The City Council discussed the revised application on October 27th, 2025, and voted 5-4 in favor of the project. The meeting minutes and project materials from this meeting are available on the City Council webpage. The revised development plans are included below.
Final Zoning Approval: The Ordinance granting zoning approval for the revised project was approved by the City Council on November 10, 2025. The approval ordinance is linked below.
Current Status: Awaiting submission of a demolition permit and building permit for the proposed structure.
Project Materials:

"The Legacy", a mixed-use Planned Development (PD) approved in November of 2024, has requested a Minor PD Adjustment to allow modifications to the development plan. The developer is proposing changes to the building footprint, interior layout, exterior design, and a reduction in height from 12-stories to 11-stories. The number of dwelling units remains as originally approved (110 dwelling unit), however, the amount of commercial floor area has reduced from 10,832 square feet to 6,980 square feet. The amount of parking has reduced from 48 parking spaces to 44 spaces (41 onsite plus 3 spaces leased within the Church Street garage). The proposal requires Minor PD Adjustment approval, which must be reviewed by the Planning & Development Committee and requires final approval from the City Council.
Final Zoning Approval: The application was approved on the consent agenda by the City Council on July 14, 2025. The meeting agenda and minutes from the July 14th City Council meeting can be accessed here. The approval Ordinance #45-O-25 can be accessed here.
Current Status: A building permit for this development has been issued and work is proceeding.
Project Materials: Development Plans

PH Development & Management LLC, is constructing a 5-story, 30 dwelling unit multi-family rental development, which will include 6 Inclusionary Housing dwelling units. The site will include 11 parking stalls on the exterior of the building and at the rear of the site with access from the alley. Additionally, the alley will provide access to an interior garage located on the first level, which will include 18 parking stalls. The applicant requested a density variation, parking variations, loading berth size variation, and rear yard coverage variation.
Land Use Commission: On March 26, 2025, the Land Use Commission voted 7-0 in favor of a recommendation of approval of this application, subject to several conditions of approval. Meeting documents and video recordings are available on the Land Use Commission webpage.
Planning & Development Committee: The project was introduced at the Planning & Development Committee on Monday, April 14, 2025, and received a vote of 7-0 in favor of forwarding the project onto the City Council. The agenda, minutes, and a video of the Planning & Development Committee meeting can be accessed here.
City Council: On Monday, April 14, 2025, the project was introduced to the City Council. The project returned to City Council on April 28th for a final vote and was unanimously approved, subject to certain conditions as outlined in Ordinance 35-O-25. City Council agendas, minutes, and videos of each meeting can be found here.
Current Status: A building permit has been issued.
Project Materials: Development Plans

A new 2-story, 24 classroom Kindergarten through 5th grade school that includes a library, sensory room, outdoor playgrounds, cafetorium and dedicated spaces and storage for arts and special classes (drama, music, art, band/orchestra, STEM).
Current Status: Under construction, estimated to open in fall 2026. For additional information please visit: https://www.district65.
Project Materials: Development Plans

Charles Davidson, CDG Capital, and Andy Ahitow, City Pads, are constructing a Planned Development for a 5-story multifamily residential building with 230 dwelling units including 23 inclusionary dwelling units and 48 open parking spaces.
Land Use Commission: The request received a unanimous recommendation for approval with conditions from the Land Use Commission on Wednesday, October 9, 2024. Meeting documents and video recordings are available on the Land Use Commission webpage.
Planning & Development Committee: The project was introduced at the Planning & Development Committee on Monday, November 11, 2024.
City Council: On Monday, November 11, 2024, the City Council discussed the project, and on Monday, November 25, 2024, the City Council approved Ordinance 92-O-24, granting the requested zoning entitlements to the development. City Council agendas, minutes, and videos of each meeting can be found here.
Current Status: The existing building on the property has been demolished and a building permit has been issued to begin work on the building foundation.
Project Materials: Development Plans

Northwestern University is constructing a new stadium with related site improvements in the U2 University Athletic Facilities District.
Current Status: Under construction
Project Materials:
City Council Approved Ordinance
City of Evanston Independent Economic Impact Study - September 2023
Project History:
Meetings:
- In-person and Virtual Special Topic 7th Ward Meeting held on June 27, 2023
- Land Use Commission: Meetings were held on September 6, 2023, September 27, 2023 and October 11, 2023. Meeting documents and video recordings are available on the Land Use Commission webpage.
- Planning & Development Committee/City Council (Introduction): October 30, 2023 at 5:30 PM in Council Chambers
- City Council (Action): November 13, 2023 at 6:00 PM in Council Chambers
Initial Application: 11-14-2022
- Zoning Analysis Application -11.14.22
- Staff Review Letter and Zoning Analysis - 12.8.22
- Planned Development Application
- Project Narrative
- Statements of Compliance
- Response to 12.8.22 Staff Review Letter
- Development Plans P1 - Site Plan/Elevations/Materials/Bird Friendly Measures
- Development Plans P2 - Renderings
- Development Plans P3 - Signage Plan and Surrounding Area Photos
- Development Plans P4 - Site Structures
- Development Plans P5 - Area Plan/Loading/Access/Circulation Diagram
- Development Plans P6 - Utilities/Drainage Plan/Topography/Soil Condition
- Development Plans P7 - Landscape Plan
- Traffic Study
- Environmental Assessment Review
- Staff Review Letter 6.12.23
Revised Application- 6.27.23
- Response to 6.12.23 Staff Review Letter
- Scoreboard
- Environmental Assessment Review - WJHW Update
- P1 -Site Plan/Elevations/Materials/Bird Friendly Measures
- P2 - Renderings
- P3 - Signage Plan
- P4 - Site Structures
- P5 - Area Plan/Loading/Access/Circulation Diagram
- P6 - Utilities/Drainage/Topography/Soil Condition
- P7 - Landscape Plan
- P8 - Fences-Walls-Lighting
- P9 - Shadow Diagrams
- P10 - Pedstrian Path
- Staff Review Letter - 8.1.23
Revised Application -8.14.23
- Response to 7.31.23 Staff Review Letter
- Okrent Kisiel Evaluation Report
- Updated Environmental Assessment Review Report
- Traffic Impact Study
- Traffic Management Plan Outline
- Revised Text Amendment Application
- Proposed Text Amendment Language
- Press Summary
- Petition In Support
- Updated Draft Letter of Intent (LOI) for Memorandum of Understanding - 8.23.23
Revised Application - 8.15.23
- P1 - Site Plan-Elevations-Materials-Bird Friendly Measures
- P2 - Renderings-Photos of Existing
- P3 - Signage Plan
- P4 - Site Structures
- P5 - Area Plan-Loading-Access-Circulation Diagram
- P6 - Utilities-Drainage-Topography-Soil Conditions
- P7 - Landscape Plan
- P8 - Fences-Walls-Lighting
- P9 - Shadow Diagrams
- P10 - Pedestrian Path
- Staff Review Letter - 8.31.23
Revised Application - 9.6.23
- Response to Staff Review Letter
- GEI Geotechnical Report
- Southeast Rendering - Plaza Entry and Ramp
- Existing and Proposed Site and Elevations
Additional Documents- 9.19.23
- Response to Land Use Commission Questions
- WJHW Response to Arup Sound Study Report
- Concert Operations Plan Outline
- South Elevation Design Alternative
- RWDI Wind Analysis Memo
- Linberger Co. - CohnReznick Rebuttal Report
- Home Game Police Call Information
- Existing vs Proposed Site Plan
- Subject Matter Expert Bios
Additional Documents - 10.4.23
- 9.27.23 Land Use Commission Response Letter
- WJHW Rebuttal to 9.27.23 Arup Responses and Steven Harper Presentation
- Kisiel Rebuttal to Camiros Report
- Game Day Operations Summary
- CTA Letter Regarding Transit on Event Days - 9.27.23
Additional Documents - 10.30.23
- Northwestern Letter with draft MOU and Traffic Management Plan
- Northwestern Revised MOU with Public Benefits - Submitted 10.30.23
Construction Management Plan
- April 4, 2024 Construction Management Plan
- February 8, 2024 Construction Management Plan
- January 19, 2024 Construction Management Plan
Vibration Monitoring
- April 2, 2024 Vibration Report
- May 5th-May 20th Vibration Report
- May 19th-June 3rd Vibration Report
- June 1st - June 30th Vibration Report
- August 1st - August 31 Vibration Report
- September 1st - September 30th Vibration Report
- October 1st - October 31st Vibration Report
- November 1st - November 30th Vibration Report
- December 1st - December 31st Vibration Report
- January 1st - January 31st Vibration report
- February 1st - February 28th Vibration report

Construction of a 60 unit mixed-income housing development.
City Council: On October 23, 2023, the City approved Ordinance 99-O-23, granting the requested zoning entitlements to the development. City Council agendas, minutes, and videos of each meeting can be found here.
Current Status: Under Construction
Project Materials: Development Plans
Vibration Monitoring Reports:- 504-514 South Blvd - Vibration Monitoring Report Baseline Readings (10-16-25 to 10-19-25)
- 504-514 South Blvd - Vibration Monitoring Report #2 (10-20-25 to 10-27-25)
- 504-514 South Blvd - Vibration Monitoring Report #3 (10-28-25 to 11-2-25)
- 504-514 South Blvd - Vibration Monitoring Report #4 (11-3-25 to 11-9-25)
- 504-514 South Blvd - Vibration Monitoring Report #5 (11-10-25 to 11-16-25)
- 504-514 South Blvd - Vibration Monitoring Report #6 (11-17-25 to 11-23-25)
- 504-514 South Blvd - Vibration Monitoring Report #7 (11-24-25 to 11-30-25)
- 504-514 South Blvd - Vibration Monitoring Report #8 (12-1-25 to 12-7-25)
- 504-514 South Blvd - Vibration Monitoring Report #9 (12-8-25 to 12-14-25)
- 504-514 South Blvd - Vibration Monitoring Report #10 (12-15-25 to 12-21-25)
- 504-514 South Blvd - Vibration Monitoring Report #11 (12-22-25 to 12-28-25)
- 504-514 South Blvd - Vibration Monitoring Report #12 (12-29-25 to 1-4-26)
- 504-514 South Blvd - Vibration Monitoring Report #13 (1-5-26 to 1-11-26)
- 504-514 South Blvd - Vibration Monitoring Report #14 (1-12-26 to 1-18-26)
- 504-514 South Blvd - Vibration Monitoring Report #15 (1-19-26 to 1-25-26)

David Wallach is constructing a 13-unit efficiency home development in the R3 Two-family Residential District.
Current Status: Under construction
Project Materials: Development Plans

Construction of a 37,800 sf three-story building housing a Mainstage Theatre, large public lobby, cafe and lounge, multi-purpose rehearsal hall, theatre support spaces, administrative offices and on-site box office. a sophisticated state-of-the-art 300-seat theatre auditorium, with a balcony and large backstage; administrative offices for full-time employees; support spaces for theatre craft; multiple bathrooms on all levels; a loading dock for scenic and theatrical elements to load-in; and a 3rd Floor roof top deck adjacent to a large rehearsal hall/event space.
Project Materials:
Planned Development (PD) Ordinance
Construction Management Plan (CMP) - for Demolition
Construction Management Plan (CMP) - for Construction - 02.04.25
Current Status: Under Construction
Estimated Completion Date: May 2026