Permit Documents

Homeowner Affidavit Forms:

An owner-occupant of a single-family residence may act as their own general contractor provided they currently reside in, or intend to reside at, the premises.

If owner-occupants are performing the mechanical, electrical or plumbing work, an owner affidavit form is required for each trade. Affidavits state the owner is knowledgeable of code requirements and will be performing the installation.  If a contractor is hired, the contractor will need to provide proof of licensure to the City and be present for inspections.  Affidavits and corresponding worksheets (i.e., mechanical, electrical and plumbing worksheets) are required prior to permit issuance.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Commercial Projects

Commercial Project Information
document seq 0.00
Building Permit Application
document seq 0.00
Certificate of Occupancy Request Form - Commercial/Multifamily
document seq 0.00
Table of Required Inspections
document seq 0.00

Commercial Checklists

Commercial & Multi-Family Plan Review Submittal Checklist
document seq 1.00
Contractor List
document seq 2.00
Construction Fence Requirements
document seq 3.00
Decks/Porches - Commercial and Multi-Unit Residential
document seq 4.00
Demolition Checklist & Sign-Off Sheet
document seq 5.00
Demolition Debris Contractor's Guide Flyer
document seq 6.00
Fence Checklist
document seq 7.00
Flatwork Checklist
document seq 8.00
Foundation Only Checklist
document seq 9.00
Garage Checklist
document seq 10.00
Lawn Sprinkler Checklist
document seq 11.00
Parking Lot Resurface Checklist
document seq 12.00
Roofing Checklist
document seq 13.00
Tent Checklist
document seq 14.00

Residential Projects

Residential Project Information
document seq 1.00
Building Permit Application
document seq 2.00
Certificate of Occupancy Request Form - Residential
document seq 3.00
Table of Required Inspections
document seq 4.00

Residential Checklists

Contractor List
document seq 1.00
Construction Fence Requirements
document seq 2.00
Deck-Porch Checklist 1-2 Family
document seq 3.00
Demolition Calculation Worksheet
document seq 4.00
Demolition Checklist & Sign-Off Sheet
document seq 5.00
Demolition Debris Homeowner's Guide to Reuse and Recycling Flyer
document seq 6.00
Demolition Debris Contractor's Guide Flyer
document seq 7.00
Fence Checklist
document seq 8.00
Flatwork Permit Checklist
document seq 9.00
Foundation Only Checklist
document seq 10.00
Garage Checklist
document seq 11.00
Lawn Sprinkler Checklist
document seq 12.00
Residential Bathroom Remodel Checklist
document seq 13.00
Residential Kitchen Remodel Checklist
document seq 14.00
Residential - One + Two Family Plan Review Submittal Checklist
document seq 15.00
Roofing Checklist
document seq 16.00
Solar Permit Checklist
document seq 17.00
Tent Checklist
document seq 18.00

Homeowner Affidavit Forms:

Mechanical - Owner Affidavit
document seq 1.00
Electrical - Owner Affidavit
document seq 2.00
Plumbing - Owner Affidavit
document seq 3.00
Roofing - Owner Affidavit
document seq 4.00

Worksheets

Demolition Worksheet - Water and Sewer
document seq 1.00
Prior to the demolition of any structure in the City of Evanston, the contractor must disconnect both the water and sewer services at the respective mains. This worksheet must be filled out and submitted with the building permit application.
Electrical Worksheet
document seq 2.00
If there is electrical work at the job site, this worksheet must be submitted prior to permit issuance.
Garage Permit Worksheet
document seq 3.00
For a detached garage permit, review this garage application form to determine if its use is appropriate for your project.  If not appropriate, architecturally prepared construction drawings would be required.
HVAC Worksheet
document seq 4.00
If there is mechanical work at the job site, this worksheet must be submitted prior to permit issuance.
Plumbing Worksheet
document seq 5.00
If there is plumbing work at the job site, this worksheet must be submitted prior to permit issuance.
Water & Sewer Services Worksheet
document seq 6.00
For a water or sewer permit, a permit application and this worksheet must be completed and submitted.
Water & Sewer Services Demolition Worksheet
document seq 7.00
For disconnections of water or sewer services. Permit application and this worksheet must be completed and submitted.
Water Service Size Calculation Worksheet
document seq 8.00
This worksheet is utilized to calculate the change in plumbing fixture units based on the new work to determine whether the existing water service is adequate or requires an increase in size.